United States · Arkansas

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Set-aside: Small Business Set Aside - Total
Buying agency
AGRICULTURE, DEPARTMENT OF — USDA FOREST SERVICE
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Published
2026-09-17
Closes
2026-09-30
Location
Fifty Six, AR
Category
Construction

Description

On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013. 2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013. This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled �C04m Attachment 11 Golder 1240BH26R0013.� This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.

View the original notice on SAM.gov

Similar tenders

Search all live tenders →

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF — AGRICULTURE, DEPARTMENT OF — USDA FOREST SERVICE tender, Arkansas