Core playbook · Free

Bid folder structure and version control

A repeatable file layout so nothing is missed or submitted in the wrong version.

What wins points

A clear, version‑controlled folder structure demonstrates compliance with Article 53 and provides transparent evidence for selection criteria under Article 58, helping evaluators verify capacity quickly.

What gets bids disqualified

Missing required files or using outdated versions leads to non‑compliance with Article 53 electronic availability and can cause exclusion under Article 58 selection criteria.

Evaluator's view

Check the top‑level index and ensure every document has the latest version number; missing or older versions are flagged immediately.

Bid folder structure and version control

What this is

A simple, repeatable file layout that ensures every tender document, communication and evidence of compliance is stored in a single place, with clear naming conventions and version numbers. It prevents missing files or mixing versions, which are common reasons for disqualification.

When you need it

Use the folder structure from the start of the procurement – during the preparation phase, when gathering market information, drafting the tender, and throughout submission. It is mandatory for complex bids that involve many documents (technical specifications, financial offers, certificates) and optional but highly recommended for any SME bid.

How to fill it in

  1. Create a top‑level folder named exactly as the procurement reference (e.g., 2026-XYZ-123).
  2. Inside create subfolders:
  3. 01_Administrative – forms, declarations, ESPD, legal documents.
  4. 02_Technical – specifications, drawings, method statements.
  5. 03_Financial – cost breakdown, pricing tables, VAT certificates.
  6. 04_Evidence – certificates of capacity, past‑performance references, audit reports.
  7. 05_Communications – emails, meeting minutes, oral‑communication records (saved as PDFs or audio transcripts).
  8. Name each file with a version suffix _v01, _v02 … and the date YYYYMMDD. Example: Technical_Specifications_v02_20260715.pdf.
  9. Keep a simple index spreadsheet (index.xlsx) at the top level listing every file, its version, last‑updated date and a short description.
  10. When updating any document, increment the version number and record the change in the index sheet.

Template

Bid Folder Structure – {{PROCUREMENT_REF}}
Date: {{DATE}}

Top‑level folder: {{PROCUREMENT_REF}}

01_Administrative/
  - ESPD_v{{VERSION}}_{{DATE}}.pdf
  - Declaration_of_conformity_v{{VERSION}}_{{DATE}}.pdf
  - Power_of_Attorney_v{{VERSION}}_{{DATE}}.pdf

02_Technical/
  - Technical_Specifications_v{{VERSION}}_{{DATE}}.pdf
  - Drawings_v{{VERSION}}_{{DATE}}.pdf
  - Method_Statement_v{{VERSION}}_{{DATE}}.pdf

03_Financial/
  - Cost_Breakdown_v{{VERSION}}_{{DATE}}.xlsx
  - Pricing_Tables_v{{VERSION}}_{{DATE}}.xlsx
  - VAT_Certificate_v{{VERSION}}_{{DATE}}.pdf

04_Evidence/
  - Capacity_Certificates_v{{VERSION}}_{{DATE}}.pdf
  - Past_Performance_References_v{{ VERSION }}_{{ DATE }}.pdf

05_Communications/
  - Meeting_Minutes_2026MMDD_v{{VERSION}}.pdf
  - Email_Summary_2026MMDD_v{{VERSION}}.txt

Top‑level index.xlsx – columns: File Path | Version | Last Updated | Description

Paste your draft response — free teaser, €9 full report

Already filled this in? We'll score your actual text against the same wins-points / disqualifies rubric above and quote your own words back for every finding.

Evaluate my draft →

Get the daily EU tender brief

Free templates, plus the live tenders that match your capability — one email a day, no card required.

Free · no card, no account needed.

Used this template already? Get this bid evaluated →

← All free templates

Bid folder structure and version control — free EU tender template